Skip to main content
Guides

New-Construction Condos in Miami: Towers Completed Since 2020, by Neighborhood

Seven Miami-area condo developments with a sourced completion year of 2020 or later, grouped by neighborhood, with each developer and year as the developer, architect, engineer or county record states it, plus where Bal Harbour and Edgewater stand.

By Published 6 min readEditorial policy
New-Construction Condos in Miami: Towers Completed Since 2020, by Neighborhood — illustration

Illustrative artwork; not a photograph of a building or residence.

Seven Miami-area condo developments in our building records have a sourced completion year of 2020 or later: Aston Martin Residences in Downtown, Park Grove in Coconut Grove, Villa Valencia in Coral Gables, Five Park in South of Fifth, Monad Terrace in South Beach, Onda in Bay Harbor Islands and The Estates at Acqualina in Sunny Isles Beach.

How the seven were chosen

A building made this list only if it is finished, not pre-construction, and a published record ties it to a year of 2020 or later. That record is the developer's or architect's project page, a design engineer's project sheet, or Miami-Dade County's property records. For the county check we queried the condominium unit parcels for each building on October 12, 2026 and read the year-built field. The developer is named the way its own source names it, which sometimes means a project company rather than a familiar brand.

Towers still being built or sold off plans are a separate board at /preconstruction, and the trade-offs between buying from a developer and buying an existing unit are covered at /blog/new-construction-vs-resale-miami-condos, so neither is repeated here. Miami has no live listing feed on this site, so nothing below describes prices, availability or sales. Eltherion, LLC publishes this as research and is not a broker.

Downtown Miami and Coconut Grove

Aston Martin Residences is the clearest case. Aston Martin's announcement of April 30, 2024 marked the opening of the 66-story tower at 300 Biscayne Boulevard Way, with 391 condominiums, delivered in partnership with G&G Business Developments. The county's unit records for the condominium at that address carry a 2024 year built. The building record is at /buildings/aston-martin-residences, and our longer guide is at /blog/aston-martin-residences-miami-guide.

Park Grove is more complicated. Terra's portfolio gives 2021 as the year of completion for the three-tower development and names the developer as 2701 Bayshore Venture, LLC and 2701 Bayshore One Park Grove LLC. The county splits it by tower: unit records for One Park Grove at 2811 South Bayshore Drive carry 2020, while Two Park Grove at 2821 and Club Residences at Park Grove at 2831 carry 2018. Only one of the three towers is a post-2020 building on the county's own record, so ask which tower a residence is in before treating it as new. See /buildings/park-grove.

Coral Gables and South of Fifth

Villa Valencia, at 515 Valencia Avenue, is a 39-residence project that Location Ventures shows as completed in May 2022, with its own role given as owner and operator. The county agrees: 36 unit records under the condominium's legal name carry a 2022 year built. It is the only building on this list with reviewed plan documents on our site, at /buildings/villa-valencia/floor-plans, and the wider plan library is at /condo-floor-plans.

Five Park is the answer to new construction south of Fifth Street. Terra's portfolio lists the 48-story Arquitectonica tower as completed in 2024 and names the developer as TCH 500 Alton, LLC. On the county record, 94 unit parcels under Five Park Condo at 501 West Avenue carry 2024. Terra's portfolio also mentions a 98-residence figure, but our record does not treat it as the building total until it is clear which residences it counts. The record is at /buildings/five-park and the neighborhood at /neighborhoods/south-of-fifth.

South Beach, Bay Harbor Islands and Sunny Isles Beach

Monad Terrace is a Jean Nouvel commission on the bay side of South Beach. Ateliers Jean Nouvel shows the project as finished, names JDS Development as the client and credits Kobi Karp as architect of record, but gives only an open-ended start date of 2015. The year here comes from the county: 60 unit records under Monad Terrace Condo at 1300 Monad Terrace carry 2021. See /buildings/monad-terrace.

Onda is the closest building on this list to Bal Harbour. Fortune International Group's project page names CMC Group and Morabito Properties as the client, Arquitectonica as architect, 41 units and a completion date of 2024. The county shows 41 Onda Condo unit records at 1135 103rd Street carrying 2024. The record is at /buildings/onda and the island town at /neighborhoods/bay-harbor-islands.

The Estates at Acqualina has two towers. CHM Structural Engineers names The Trump Group as developer and lists 2022 for the project as a whole, without a separate year for each tower. The county records sit close to that: most unit records under 777 Via Acqualina Condo at 17901 Collins Avenue carry 2022, and most under 888 Via Acqualina Condo at 17975 Collins Avenue carry 2023, with a handful in each building dated 2025. Our records split the development into /buildings/the-estates-at-acqualina-south-tower and /buildings/the-estates-at-acqualina-boutique-north-tower.

Where Bal Harbour and Edgewater fit

People searching for new construction in Bal Harbour should know that none of our Bal Harbour records shows a building completed since 2020. Rivage Bal Harbour is recorded as under construction, which puts it on the pre-construction side. Onda, just west in Bay Harbor Islands, is the closest completed building on this list.

Edgewater has finished towers in our records, but none with a completion year we can source. OKO Group's portfolio shows Missoni Baia as completed, with 57 floors and 249 residences, but gives no completion year, so it is left off the dated list. Aria Reserve is the opposite case. Our record still lists it as under construction, yet the county already has 383 unit records under Aria Reserve South at 700 NE 24th Street carrying a 2025 year built. A county year-built entry is an assessment field, not a certificate of occupancy, so ask the seller or developer which certificate covers the specific tower. The neighborhood guide is at /neighborhoods/edgewater.

When the published years disagree

Arte Surfside shows why one source is not enough. ACPV Architects lists the project under 2020 and names Sapir Corp Ltd as client, the structural engineer also gives 2020, and our record notes that the contractor gives 2019 for delivery. With the sources split across the 2020 line, it is not counted here.

A developer's completion date can mean the last tower of a phased project, the opening of amenities or a marketing milestone. The county's year built is an assessment entry. Neither replaces the documents that matter to a buyer: the certificate of occupancy from the city's building department, the recorded declaration, and the association's own records, which /condo-associations helps you find. In a recently finished building, also ask whether owners or the developer currently control the association board.

Questions buyers ask about Miami's newest completed condos

Which new-construction condos in Miami have been completed since 2020?

In our building records, seven developments have a sourced completion year of 2020 or later: Aston Martin Residences in Downtown (2024), Park Grove in Coconut Grove (2021 for the development, though two of its three towers carry 2018 on county records), Villa Valencia in Coral Gables (2022), Five Park in South of Fifth (2024), Monad Terrace in South Beach (2021), Onda in Bay Harbor Islands (2024) and The Estates at Acqualina in Sunny Isles Beach (2022 for the project).

Are there new construction condos in Bal Harbour?

None of the Bal Harbour buildings in our records has a sourced completion year of 2020 or later. Rivage Bal Harbour is recorded as under construction. The closest completed building on our list is Onda in Bay Harbor Islands, which Fortune International Group lists as completed in 2024 for CMC Group and Morabito Properties.

Is there new construction in South of Fifth?

Yes. Terra's portfolio lists Five Park, the 48-story Arquitectonica tower at 501 West Avenue, as completed in 2024 with TCH 500 Alton, LLC as developer, and Miami-Dade County's unit records for Five Park Condo carry a 2024 year built.

Which new-construction towers in Edgewater are finished?

OKO Group lists Missoni Baia as completed but publishes no completion year, and our record still lists Aria Reserve as under construction even though county unit records for Aria Reserve South carry 2025. Neither has a sourced completion year in our records, so check the certificate of occupancy for the specific tower.

Does Miami Condo HQ show prices or available units in these buildings?

No. The site has no live Miami listing feed, so it does not publish prices, availability or sales for these buildings. Eltherion, LLC is a research publisher, not a broker, and the building pages carry the sourced records only.

Sources and review scope

Sources checked 2026-10-12. The notes identify which facts each publication supports.

Our editorial policy and corrections process
Tagged:Miami condosnew constructionFive ParkAston Martin ResidencesPark GroveOndaEstates at Acqualinabuilding records

Written by

Publisher and editor, Miami Condo HQ

Miami Condo HQ is published by Eltherion, LLC. This article is not reviewed by a licensed real estate agent or broker and is not professional advice.

Back to all articles

Keep reading

Get the next Miami market report first

One concise email when we publish — quarterly data, new developments and the buildings worth watching.

By subscribing you agree to receive Miami research emails and to have your details shared with our partner real-estate professionals. Unsubscribe anytime.